Waste-to-Energy Plant Design, Construction and Operation

Explore our high-impact domestic and international projects across wastewater treatment, public buildings, industrial facilities, and energy infrastructure, categorized for your convenience.

05.10.2021 - Ongoing

Scope: Engineering, Procurement and Construction of the Waste-to-Energy Plant

Process: A conventional, state-of-the-art grate-type incineration furnace, landfill, leachate treatment

Units: bunker and tipping hall including cranes; combustion system including feed chute pusher, grate and ash extractor; boiler including superheater and economizer; boiler make-up water demineralization unit; air pollution control (APC) system including all required conveying, dosing and storage units; generator; extraction condensing turbine and condenser; seawater intake/discharge structure including all piping works, pumps, etc.; Waste-to-Energy (WtE) Plant including building structures and building services; weighbridge station; bottom ash processing plant; landfill area for residual waste from the WtE plant; treatment plant for leachate and wastewater from the landfill area; all auxiliary infrastructure.