Ataköy Advanced Biological Wastewater Treatment Plant Phase II Construction
Explore our high-impact domestic and international projects across wastewater treatment, public buildings, industrial facilities, and energy infrastructure, categorized for your convenience.

Istanbul Water and Sewerage Administration (İSKİ)
17.05.2016 - 09.03.2020
Scope: Engineering, Procurement, Phase 2 Construction, and Revamping of the Existing Facility
Process: Advanced Biological Wastewater Treatment (N-P Removal) + Tertiary Treatment with Membrane Bioreactor (MBR))
Units: Two inlet pumping stations, physical treatment facilities, advanced biological wastewater treatment plant, sludge treatment units (thickening + dewatering), fluidized-bed sludge drying facility, thermal unit (4x12 MW hot oil boiler) and water recovery (membrane bioreactor (MBR)) unit .