Bursa Eastern Region Wastewater Treatment System Project

Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

Employer: Green Environment Treatment Plant Operators Cooperative Main Contractor: ATAÇ-ALKE-ARBİOGAZ Joint Venture

01.04.2004 -23.06.2006

Scope: Engineering, Procurement, Equipment Supply & Installation, Construction, Commissioning

Process: Biological Wastewater Treatment, collection of domestic and industrial wastewater, Advanced (N-P Removal) construction

Units: Stabilization Tanks : 2 x 6,250 m3 = 11,250 m3

Primary Sedimentation : 2 x Ø 28.60 m

Aeration Tanks : 2 x 14,076 m3 = 28,152 m3

Final Sedimentation : 2 x Ø 46.10 m

Sludge Pump Stations, Sludge Thickening, Treated Water Storage Tank, Sludge Disposal Storage Area.