Goychay Wastewater Treatment Plant
Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

AZERSU
13.11.2015 – 20.08.2019
Scope: Construction, Commissioning, Procurement, Equipment Supply and Installation
Process: Nutrient Removal and Advanced Treatment with Long Aeration Activated Sludge Technology
Units: Coarse screen, fine screen, grit chamber, influent pumping station, bio-phosphorus unit, aeration tanks, distribution chamber, settling tank, TV1 valve chamber, screenings pumping station, return and excess sludge pumping station, compressor building, sludge dewatering unit, sludge dewatering pumping station, UV disinfection unit, disc filter, treated water tank, drainage pumping station, disc filter, return pumping station, electrical power supply line, CCTV, instrumentation, SCADA automation system.