Construction of the 2nd Phase of the Ayrancılar-Yazıbaşı Wastewater Treatment Plant in Torbalı District, İzmir Province

Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

Izmir Water and Sewerage Administration General Directorate (İZSU)

06/10/2021 – In Progress

Scope: Supply, Equipment Procurement, Installation, Construction, Commissioning

Process: Turnkey Construction Works

Units: Screen units, influent pumping station, Sand and Grease Trap Unit, anaerobic tank and anaerobic phosphorus basins, aeration basins, final settling tanks, UV disinfection unit, RAS&WAS pumping station, centrifuge sludge dewatering unit, odor removal unit, ancillary buildings.