Work Package 2: Construction of Wastewater Treatment Facilities in Akçalar, Küçükkumla, and Nilüfer

Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

Bursa Water and Sewerage Administration (BUSKİ)

12.04.2016 - 17.08.2019

Scope: Engineering, Procurement, Construction, Commissioning, and 1-Year Operation in accordance with FIDIC Design and Build Contract Conditions.

Process: Advanced Biological Wastewater Treatment (N-P Removal)

Units: Inlet pumping stations, physical treatment facilities, biological wastewater treatment plant, UV disinfection, and sludge treatment section