Rehabilitation of Existing Wastewater Treatment Plants (Gümbet and Gümüşlük WWTP)

Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

Muğla Water and Sewerage Administration General Directorate (MUSKİ)

12.03.2021 – 30.09.2023

Scope: Detailed Design, Equipment Supply and Installation, Construction and Commissioning Works for Capacity Expansion of the Existing Two WWTPs with the MBR System.

Process: Advanced Biological Wastewater Treatment (N-P Removal)

Units: Preliminary treatment facilities, anoxic and aerobic tanks, MBR unit, disinfection tank, sludge treatment (thickening and dewatering) units, chemical storage and dosing units, and all necessary auxiliary equipment.