Operation of the Muğla-Bodrum İçmeler-Torba Wastewater Treatment Plant

Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

Ministry of Culture and Tourism

10.05.2023 – 11.05.2033

Scope: 10-year operation of the wastewater treatment plant

Process: Turnkey Construction Works

Units: Screening units, inlet pumping station, Sand and Grease Trap Unit, anaerobic phosphorus basins, aeration basins, final clarifiers, UV Disinfection Unit, RAS&WAS pumping station, centrifugal sludge dewatering unit, odor control unit, auxiliary buildings.