Muğla-Bodrum İçmeler-Torba Wastewater Treatment Plant and Kızılağaç, Yalı and Çiftlik Sewerage Network Infrastructure Works
Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

Ministry of Culture and Tourism
25.02.2022 – 02.10.2023
Scope: Supply, Equipment Procurement and Installation, Construction, Commissioning
Process: Turnkey Construction Works
Units: Screening units, influent pumping station, Sand and Grease Trap Unit, anaerobic phosphorus basins, aeration basins, final settling tanks, UV Disinfection Unit, RAS&WAS pumping station, centrifuge sludge dewatering unit, odor control unit, auxiliary buildings.
.