Development of Water Supply and Wastewater Systems in the City of Mykolaiv » LOT I: Wastewater Treatment Plant Rehabilitation
Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

Municipal Enterprise “Mykolayivvodokanal”
05.03.2021 – Ongoing
Scope: Detailed Design for Phases 1&2&3,
Stage 1 Equipment Supply and Installation, Construction and Commissioning Works for the Rehabilitation of the Existing Wastewater Treatment Plant
Process: Advanced Biological Wastewater Treatment (N-P Removal)
Units: Preliminary sludge pumping station, primary sludge gravity thickening unit, BioP tank, activated sludge tank, WAS & RAS pumping station, WAS thickening unit, thickened sludge storage tank, sludge dewatering unit for Stage 1.
Digester and Gas Treatment Units for Stage 2 and Microfiltration for Phase 3.