TS-CW-01: Rehabilitation of Wastewater Treatment Plants (Design, Supply and Installation) / Lot 2: Rehabilitation of the 100,000 m3/day-capacity WWTP at Almalık City Wastewater Treatment Plant, UZBEKISTAN

Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

“Uzsuvtaminot” Joint Stock Company

27.08.2022 – Ongoing

Scope : Engineering, Procurement, Equipment Supply and Installation, Construction, Commissioning

Process : Biological Treatment (C-N removal)

Units : Screening Unit, Sand and Grease Removal Unit, Aeration Tank, Final Settling Tank, Biological Basins, Chlorine Contact Tank, Gravity Thickening, Aerobic Stabilization Tank, Sludge Drying Beds