TS-CW-01: Wastewater Treatment Plant Rehabilitation (Design, Supply and Installation) / Lot 3: Rehabilitation of the 100,000 m3/day capacity WWTP in the city of Angren, UZBEKISTAN
Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

“Uzsuvtaminot” Joint Stock Company
27.08.2022 – Ongoing
PROJECT OVERVIEW
Scope : Engineering, Procurement, Equipment Supply and Installation, Construction, Commissioning
Process: Biological Treatment (C-N Removal)
Units: Screen Unit, Sand and Grease Removal Unit, Aeration Tank, Final Settling Tank, biological basins, Chlorine Contact Tank, gravity thickening, Aerobic Stabilization Tank, Sludge Drying Beds