TS-CW-02 / Expansion and Rehabilitation of WWTPs (Design, Supply and Installation) / Lot 2: Rehabilitation of the 130,000 m3/day WWTP in Chirchik City, UZBEKISTAN

Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

“Uzsuvtaminot” Joint Stock Company

27.08.2022 – Ongoing

Scope: Engineering, Procurement, Equipment Supply and Installation, Construction, Commissioning

Process: Biological Treatment (C-N Removal)

Units: Screening Unit, Sand and Grease Removal Unit, Aeration Tank, Secondary Clarifier, Disc Filter, Chlorine Contact Tank, Gravity Thickening, Aerobic Stabilization Tank, Sludge Drying Beds