Çarşamba Wastewater Treatment Plant and Collector Construction Projectu000b

Atıksu arıtma, kamu binaları, endüstriyel tesisler ve enerji altyapısı alanlarında yurt içi ve uluslararası projelerimizi kategoriye göre inceleyebilirsiniz.

EU Investments Department – Ministry of Environment and Urbanization

29.04.2020 – 05.09.2023

Scope: Engineering, Procurement, Construction,

Commissioning in accordance with the FIDIC Design and Build Contract Conditions

Process: Advanced Biological Wastewater Treatment (N-P Removal)

Units: Inlet pumping station, physical treatment facilities, BioP basins, advanced biological wastewater treatment plant, sludge treatment units and odor removal units.