Çarşamba Wastewater Treatment Plant and Collector Construction Work
İşveren
Department of EU Investments - Ministry of Environment and Urbanization
Tarih
29.04.2020 – 05.09.2023
Tesis Kapasitesi
Preliminary Treatment: 19.000 m3/day Biological Treatment: 15.500 m3/day
Açıklama
Scope: Engineering, Procurement, Construction,
Commissioning according to FIDIC Design and Build Contract Conditions
Process: Advanced Biological Wastewater Treatment (N-P Removal)
Units: Influent pumping station, physical treatment plants, BioP ponds, advanced biological wastewater treatment plant, sludge treatment units and deodorization units.