Tuzla 3rd Stage Advanced Biological Treatment Plant Construction

ileri biyolojik arıtma

İşveren

Istanbul Water and Sewerage Administration (ISKI)

Tarih

22.02.2018 – 13.02.2024

Tesis Kapasitesi

Preliminary Treatment: 1st, 2nd and 3rd stage capacity Biological Treatment: 400,000 m3/day (3rd stage capacity)

Açıklama

Scope: Engineering, Procurement, Construction, Commissioning

Process: Advanced Biological Wastewater Treatment (N-P Removal)

Units: Two inlet pumping stations, physical treatment facilities, advanced biological wastewater treatment plant and sludge treatment units with all necessary auxiliaries.