Scope: Detailed Design for Phase 1&2&3,
1st Stage Equipment Supply and Installation, Construction and Commissioning Works for Rehabilitation of Existing Wastewater Treatment Plant
Process: Advanced Biological Wastewater Treatment (N-P Removal)
Units: Pre-sludge pumping station, primary sludge gravity thickening unit, BioP tank, activated sludge tank, WAS & RAS pumping station, WAS thickening unit, thickened sludge storage tank, sludge dewatering unit for stage
1.Digester and Gas Treatment Units for Stage
2 and Microfiltration for Phase 3.
Projects
Explore More
We will provide an overview of our ongoing construction projects, including timelines and milestones.
Treatment and Infrastructure
Business
Energy Facilities
Superstructure Construction
Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul
+90 216 693 23 14
+90 216 693 23 18
© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş