Development of Water Supply and Wastewater Systems in Mykolaiv City” LOT I: Waste Water Treatment Plant Rehabilitation

atık su arıtma tesisi

İşveren

Municipal Entreprise “Mykolayivvodokanal”

Tarih

05.03.2021 - Continues

Tesis Kapasitesi

1st Stage: 58.500 m3/day 2nd Stage: 65.500 m3/day

Açıklama

Scope: Detailed Design for Phase 1&2&3,

1st Stage Equipment Supply and Installation, Construction and Commissioning Works for Rehabilitation of Existing Wastewater Treatment Plant

Process: Advanced Biological Wastewater Treatment (N-P Removal)

Units: Pre-sludge pumping station, primary sludge gravity thickening unit, BioP tank, activated sludge tank, WAS & RAS pumping station, WAS thickening unit, thickened sludge storage tank, sludge dewatering unit for stage

1.Digester and Gas Treatment Units for Stage

2 and Microfiltration for Phase 3.


Projects

Explore More

We will provide an overview of our ongoing construction projects, including timelines and milestones.

Treatment and Infrastructure

Business

Energy Facilities

Superstructure Construction

Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul

+90 216 693 23 14

+90 216 693 23 18

Homepage

Projects

About Us

Sustainability

Career

© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş