Revision of Existing WWTPs (Gumbet and Gumusluk WWTP)
İşveren
Muğla General Directorate of Water and Sewerage Administration (MUSKI)
Tarih
12.03.2021 – 30.09.2023
Tesis Kapasitesi
Gumbet WWTP : 29.900 m3/d Gümüşlük WWTP : 9.900 m3/d Total MBR membrane area: 105.600 m2
Açıklama
Scope: Detailed Design, Equipment Supply and Installation, Construction and Commissioning Works for Capacity Increase of two existing WWTPs with MBR System.
Process: Advanced Biological Waste Water Treatment (N-P Removal)
Units: Pretreatment plants, anoxic and aerobic ponds, MBR unit, disinfection pond, sludge treatment (thickening and dewatering) units, chemical storage and dosing units and all necessary auxiliary equipment.