Revision of Existing WWTPs (Gumbet and Gumusluk WWTP)
İşveren
Muğla General Directorate of Water and Sewerage Administration (MUSKI)
Tarih
12.03.2021 – 30.09.2023
Tesis Kapasitesi
Gumbet WWTP : 29.900 m3/d Gümüşlük WWTP : 9.900 m3/d Total MBR membrane area: 105.600 m2
Açıklama
Scope: Detailed Design, Equipment Supply and Installation, Construction and Commissioning Works for Capacity Increase of two existing WWTPs with MBR System.
Process: Advanced Biological Waste Water Treatment (N-P Removal)
Units: Pretreatment plants, anoxic and aerobic ponds, MBR unit, disinfection pond, sludge treatment (thickening and dewatering) units, chemical storage and dosing units and all necessary auxiliary equipment.
Projects
Explore More
We will provide an overview of our ongoing construction projects, including timelines and milestones.
Treatment and Infrastructure
Business
Energy Facilities
Superstructure Construction
Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul
+90 216 693 23 14
+90 216 693 23 18
© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş