12.03.2021 – 30.09.2023

Tesis Kapasitesi

Gumbet WWTP : 29.900 m3/d Gümüşlük WWTP : 9.900 m3/d Total MBR membrane area: 105.600 m2

Açıklama

Scope: Detailed Design, Equipment Supply and Installation, Construction and Commissioning Works for Capacity Increase of two existing WWTPs with MBR System.

Process: Advanced Biological Waste Water Treatment (N-P Removal)

Units: Pretreatment plants, anoxic and aerobic ponds, MBR unit, disinfection pond, sludge treatment (thickening and dewatering) units, chemical storage and dosing units and all necessary auxiliary equipment.


Projects

Explore More

We will provide an overview of our ongoing construction projects, including timelines and milestones.

Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul

+90 216 693 23 14

+90 216 693 23 18

Homepage

Projects

About Us

Sustainability

Career

© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş