Mersin Province Erdemli District Kargıpınarı District Existing Wastewater Treatment Plant Rehabilitation and Capacity Increase Construction Work
İşveren
Mersin Belediyesi Su ve Kanalizasyon İdaresi (MESKİ)
Tarih
09.09.2015 - 17.10.2016
Tesis Kapasitesi
6,000 m³/gün
Açıklama
Scope: Rehabilitation of the existing wastewater treatment plant and increasing its capacity from 1800 m3/day to 6000 m3/day
Overhaul of inlet pumping station equipment and piping, process ponds, demolition of existing blower building.
Process: Advanced Biological Waste Water Treatment (N-P Removal)
Units: Pretreatment units, grit and degreasing units, new additional biological treatment unit including SBR (Sequencing Batch reactor) with N&P removal, sludge pump station, sludge pond and sludge dewatering building.
Translated with DeepL.com (free version)
Projects
Explore More
We will provide an overview of our ongoing construction projects, including timelines and milestones.
Treatment and Infrastructure
Business
Energy Facilities
Superstructure Construction
Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul
+90 216 693 23 14
+90 216 693 23 18
© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş