Ambarlı Advanced Biological Wastewater Treatment Plant Construction

ambarlı

İşveren

Employer: Istanbul Water and Sewerage Administration (ISKI) Main Contractor: Alke-PWT-Faber Consortium

Tarih

01.02.2008 - 30.06.2012

Tesis Kapasitesi

Biological Treatment: 520,000 m3/day Average Flow: 400.000 m3/day

Açıklama

Scope: Engineering, Procurement, Construction, Commissioning

Process: Advanced Biological Wastewater Treatment (N-P Removal)

Units: Wastewater pumping stations, sand-grease removal unit, screen building, primary sedimentation tanks (2xØ49 m), bio-p tanks (34.195 m3), aeration tanks (272.800 m3), final sedimentation tanks (2xØ51. 80 m), pumping stations, water tanks, blower building, sludge thickening-dewatering-thermal sludge drying building, sludge digestion tanks, excess sludge storage tanks, dry gas tanks, cogeneration unit (2 x 4.6 MW), biofilter control unit, ozone odor control unit, waste water recovery and ultrafiltration unit.


Projects

Explore More

We will provide an overview of our ongoing construction projects, including timelines and milestones.

Treatment and Infrastructure

Business

Energy Facilities

Superstructure Construction

Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul

+90 216 693 23 14

+90 216 693 23 18

Homepage

Projects

About Us

Sustainability

Career

© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş