Ambarlı Advanced Biological Wastewater Treatment Plant Construction
İşveren
Employer: Istanbul Water and Sewerage Administration (ISKI) Main Contractor: Alke-PWT-Faber Consortium
Tarih
01.02.2008 - 30.06.2012
Tesis Kapasitesi
Biological Treatment: 520,000 m3/day Average Flow: 400.000 m3/day
Açıklama
Scope: Engineering, Procurement, Construction, Commissioning
Process: Advanced Biological Wastewater Treatment (N-P Removal)
Units: Wastewater pumping stations, sand-grease removal unit, screen building, primary sedimentation tanks (2xØ49 m), bio-p tanks (34.195 m3), aeration tanks (272.800 m3), final sedimentation tanks (2xØ51. 80 m), pumping stations, water tanks, blower building, sludge thickening-dewatering-thermal sludge drying building, sludge digestion tanks, excess sludge storage tanks, dry gas tanks, cogeneration unit (2 x 4.6 MW), biofilter control unit, ozone odor control unit, waste water recovery and ultrafiltration unit.
Projects
Explore More
We will provide an overview of our ongoing construction projects, including timelines and milestones.
Treatment and Infrastructure
Business
Energy Facilities
Superstructure Construction
Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul
+90 216 693 23 14
+90 216 693 23 18
© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş