Ataköy Advanced Biological Wastewater Treatment Plant Phase II Construction
İşveren
Istanbul Water and Sewerage Administration (ISKI)
Tarih
17.05.2016 - 09.03.2020
Tesis Kapasitesi
Preliminary Treatment: 400.000 m3/day Stage II Biological Treatment: 240.000 m3/day Sludge Drying: 450 t/day MBR: 20.000 m3/day
Açıklama
Scope: Engineering, Procurement, Stage 2 Construction and Revision of Existing Facility
Process: Advanced Biological Wastewater Treatment (N-P Removal) + Tertiary Treatment with Membrane Bioreactor (MBR))
Units: Two influent pumping stations, physical treatment plants, advanced biological wastewater treatment plant, sludge treatment units (thickening + dewatering), fluidized bed sludge drying plant, thermal unit (4x12 MW thermal oil boiler) and water recovery (membrane bioreactor (MBR)) unit.
Projects
Explore More
We will provide an overview of our ongoing construction projects, including timelines and milestones.
Treatment and Infrastructure
Business
Energy Facilities
Superstructure Construction
Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul
+90 216 693 23 14
+90 216 693 23 18
© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş