Muş Sugar Factory Anaerobic and Aerobic System Wastewater Treatment Plant
İşveren
Sugar Factories Inc.
Tarih
07.08.2009 - 15.11.2010
Tesis Kapasitesi
Anaerobic Treatment: 150 m3/saat Aerobic Treatment: 250 m3/saatAnaerobik Arıtma: 150 m3/saat Aerobik Arıtma: 250 m3/saat
Açıklama
Scope: Engineering, Procurement, Construction, Commissioning
Process Anaerobic and Aerobic Wastewater Treatment + Biogas Treatment
Units: Anaerobic and aerobic wastewater treatment units with full automation and boilers to utilize biogas.
Stabilization Tanks : 6,050 m3
Lamella Sedimentation : 620 m3
Aeration Tanks : 5,400 m3
Final Sedimentation : Ø 29.70 m
Hydrolysis Tanks : Ø 8.20 m, H: 19.0 m
Anaerobic Tanks : Ø 19.50 m, H: 19.0 m
Projects
Explore More
We will provide an overview of our ongoing construction projects, including timelines and milestones.
Ertürk Sok. NO:1 K1 Plaza Beykoz - İstanbul
+90 216 693 23 14
+90 216 693 23 18
Homepage
Projects
About Us
Sustainability
Career
© ALKATAŞ İNŞAAT VE TAAHHÜT A.Ş